CONSTRUCTION TIMELINE
 
 

 

January 2008
Ground was broken on the University Center.
UC Groundbreaking
 
January-August 2008
Drill test wells: Consultants drilled test wells to determine the availability of ground water.
 
 
January-August 2008
Ground water capacity tests: Engineering firm performed testing to determine whether the capacity of the aquifer is sufficient to utilize ground water for condenser feed in lieu of a cooling tower.
 
 
January-August 2008
Final design documents completed: Architects completed final design documents, state drawing approvals & bid packages.
 
 
January-August 2008
Bid process: The bid process is a lengthy process which includes all appropriate approvals from the state. There are specific timelines set by the state for advertising, time for contractors to compile bids and notification procedures.
 
 
 January-August 2008
Establish temporary parking & lay down area: In order to replace parking that was lost by the construction perimeter contractors have established a temporary gravel lot just east of the university center. A lay down area for materials is also in progress.
 
January-August 2008
Establish construction perimeter & pedestrian paths: For the safety of our students, faculty and staff the construction perimeter has been fenced off and alternate pedestrian paths have been established to provide safe access as well as handicapped accessibility. This effort will be ongoing as parking needs are identified and construction progresses.
 
January-August 2008
Utility coordination relocation: As a part of the University Center project there are major utility relocations required. A transformer near the UC has been relocated by Appalachian Electric Power and there are other utility relocations in progress.
 

·        August 2008
Construction fencing in place and construction begins.

 

      September 2008
Demolition of existing loading dock, south brick veneer and glazing, and miscellaneous items at north area of UC.

 
September 2008
Begin installation of HVAC wells and related infrastructure, and begin construction of Mechanical Room at ATC Building.
 
September 2008
Begin utility tunnel excavation and installation under footprint of new addition, and re-route water line and storm sewer lines around footprint of new addition.
 
October 2008
Installation of vaults on geothermal wells. Completions of condenser well water piping. HVAC underground piping to be completed.
         
 
October 2008
Site investigation for existing utilities continues during which old existing utilities will be removed. Gas line relocation to be complete along the building perimeter. Begin utility tunnel excavation.
 
 
October 2008
Complete installation of sanitation and storm sewers.
Completion of south UC demolition.
        
 
October 2008
ATC metal framing and drywall finishing to be completed. Finishing of ATC drywall and paint.
 
October 2008
Begin perimeter building foundations for the north UC expansion.
               
   
November 2008
Addition of perimeter building foundations for the south UC expansion.
                UC Expansion South Foundations
November 2008
Interior foundation column pads for south UC expansion.
               
November 2008
South firewall complete and braced.
               
November 2008
Installation of concrete foundation walls for the north UC expansion.
               
November 2008
Completion of elevator in north UC expansion.
               
December 2008
Footings and foundations complete.
               
December 2008
Reception of structural steel
               
December 2008
Build up of building pads and prepare for pouring of building slabs.
               
December 2008
Pouring of building slabs.
               
December 2008
Complete utility tunnel walls and foundations.
               
December 2008
Installation of under slab utilities.
               
January 2009
All foundations, foundation walls and grade beams are complete.
               
January-February 2009
South-Under slab sanitary storm piping to be completed
.
               
January-February 2009
South-Under slab electrical conduit to be completed.
               
January-February 2009
South-Structural steel erection and second floor/roof decking to begin and be completed.
               
March 2009
South-Light Guage Metal Framing,
South Roofing, Sheathing and Masonry to begin.
South Structural steel to be erected.
                UC Update photo 3.09          UC Update Photo 3.09
               
March 2009
North-under slab utilities to be completed.
Selective demolition and framing of curtain wall,
structural steel to be erected.
 
               UC update photo                     
April 2009
South roofing to be completed, exterior walls
going up and masonry complete on east end.
                         UC update photo
April 2009
North-Tie in to existing building structure. 
Curtain walls to go up.
               UC update photo         UC update photo
   
   
   
                 
                 
Directories Offices Library Search MySSU

This page maintained by Tracy Conn


Shawnee State University
940 Second Street
Portsmouth, Ohio 45662-4344
To_SSU@shawnee.edu
740.351.4SSU
TTY: 740.351.3159

Last Updated:
02.18.2010 01:52 PM

For technical issues, please contact the webmaster at Webmaster@Shawnee.edu
©Shawnee State University